Submission in case of exemption from approval of a building project
Service Description
In the case of smaller building projects (such as single-family and two-family houses and other comparable buildings) that are within the scope of a development plan and do not contradict its stipulations, only a notification is required instead of a building permit. Construction can begin after one month if the local building authority does not require a simplified building permit procedure to be carried out beforehand.
Since no building permit is issued, the builder bears sole responsibility for compliance with all the requirements that his building project must meet.
Tip: Obtaining the neighbors' consent to the building project can speed up the procedure if neighborly concerns may be affected.
Process flow
The builder shall submit the required documents to the municipality. The municipality shall immediately submit a production of the documents to the lower building supervisory authority, unless it is itself the building supervisory authority. The municipality may declare that a review of the requirements for the permit exemption is to be carried out in a simplified building permit procedure or that there are other reasons for carrying out the simplified permit procedure.
Who should I contact?
Contact your local or city government (building department).
Requirements
none
Which documents are required?
- Form Template
- Construction drawings
- Site plan
- Building description
- Excerpt from real estate map
Please submit the building notification in duplicate.
What are the fees?
What deadlines do I have to pay attention to?
If the construction project is to be executed more than 3 years after the expiration of the 1-month period or notification by the municipality, the documents must be resubmitted.
Processing duration
Construction may begin after one month or upon written notification of the municipality before the expiration of this period.
Legal basis
What else should I know?
The exemption from approval does not release from the requirements regarding the preparation and, if necessary, verification of the structural engineering proofs.
Supporting institutions
If a simplified approval procedure is to be carried out, the lower building supervisory authority is responsible for issuing a building permit.
Author
The text was automatically translated based on the German content per DeepL.
Technically approved by
Professionally released on
Source: Zuständigkeitsfinder Thüringen (Linie6PLus)
No competent authority found
Please enter your location.