Building - application for building permit / for permit exemption

Service Description

If new buildings are erected, changes are made to buildings or their use is changed, a building permit is required for this. This does not apply to smaller construction projects, for which certain conditions apply.

The Thuringian Building Code thus distinguishes between four different situations in the case of new construction, alteration or change of use of buildings:

1. projects for which a building permit procedure must be carried out and a building permit issued. The building permit procedure is regulated inSection 63 of the Thuringian Building Code. It is carried out by the lower building supervisory authority. The building permit is granted if the project is not in conflict with any regulations under public law.

2. projects for which a building permit is required, which can probably be granted in a simplified building permit procedure.
Smaller projects (such as single-family and two-family houses and other comparable buildings) can be examined in a simplified building permit procedure.Section 62 of the Thuringian Building Code regulates which projects this applies to. The simplified building permit procedure is less time-consuming. A decision on the building application is taken within three months of submission of the complete application documents.

3.projects for which no building permit is expected to be required, but which must be notified. According toSection 61 of the Thuringian Building Code, the construction of selected smaller projects within the scope of a development plan does not require a building permit if the provisions of the development plan are complied with and the development is secured. Projects of this type must be submitted to the municipality for review. The examination is carried out in a permit exemption procedure. 4.

4.projects that do not require a building permit and do not have to be notified.Section 60 of the Thuringian Building Code specifies which projects on structural facilities are exempt from procedures. Such projects do not have to be notified to the municipality or the lower building supervisory authority.

Source: Zuständigkeitsfinder Thüringen (Linie6PLus)