Notification of facilities for the storage and filling of liquid manure, slurry, solid manure or silage leachate
Service Description
If you want to build or substantially change a facility for storing and filling liquid manure, slurry, solid manure or silage leachate (JGS facility), this may require notification under water law.
Process flow
- Notification of the construction or substantial modification of a facility for the storage and filling of liquid manure, slurry, solid manure or silage leachate (JGS facility) must be made by the developer at least six weeks in advance.
- The water authority examines the documents. It may temporarily or permanently prohibit the project or issue a notice with conditions.
Competent authority
The lower water authorities at the locally responsible district office or the locally responsible independent city are responsible.
Requirements
The facilities must comply with the requirements of the Ordinance on Facilities for Handling Substances Hazardous to Water (AwSV). This must be proven with the documents to be submitted.
Which documents are required?
- completed notification form
- detailed documents describing the project (site plan, drawings, proofs, descriptions)
- if necessary, expert opinion
What are the fees?
The amount of the fee is determined by the Thuringian administrative cost regulations for the business area of the Ministry for the Environment, Energy and Nature Conservation. The fee amount depends on the type of plant and the associated inspection effort. The fee range extends from €60 to €2,500.
What deadlines do I have to pay attention to?
Notification of construction or substantial alteration must be given by the developer at least six weeks in advance.
Processing duration
- The processing of a complaint takes on average one month.
- If the documents are complete,
- no other procedure such as an exemption in the water protection or flood area results from it, and
- no conditions are imposed by the water authority in the form of a decision,
- the project can be carried out after the expiry of the six-week period (fictitious approval).
- If the project is the subject of another procedure, e.g. according to the Federal Immission Control Act, the notification according to Annex 7 No. 6.1 AwSV does not apply if the project is examined within the framework of the other procedure. In this case, the six-week period does not apply.
Legal basis
Applications / forms
Opposition
Appeal
Forms/online services available: Yes
Written form required: No
Informal application possible: Yes
Personal appearance required: No
What else should I know?
Comments
- If the project is the subject of another procedure, e.g. according to the Federal Immission Control Act, the notification according to Annex 7 No. 6.1 AwSV is not required if the project is examined within the framework of the other procedure.
Author
The text was automatically translated based on the German content.
Technically approved by
Thuringian Ministry for the Environment, Energy and Nature Conservation
Professionally released on
30.12.2022