Notification of facilities for the storage and filling of liquid manure, slurry, solid manure or silage leachate
Service Description
If you wish to construct or significantly modify a facility for the storage and filling of liquid manure, slurry, solid manure or silage slurry (JGS facility), this may be subject to notification under water legislation.
Process flow
- The developer must notify the authorities at least six weeks in advance of the construction or significant modification of a facility for the storage and filling of liquid manure, slurry, solid manure or silage seepage (JGS facility).
- The water authority examines the documents. It may temporarily or permanently prohibit the project or issue a notice with conditions.
Competent authority
The lower water authorities at the locally responsible district office or the locally responsible independent city are responsible.
Requirements
The systems must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.
Which documents are required?
- Completed notification form
- detailed documents describing the project (site plan, drawings, certificates, descriptions)
- Expert opinion, if applicable
What are the fees?
The amount of the fee is determined by the Thuringian Administrative Cost Regulations for the Ministry for the Environment, Energy and Nature Conservation. The amount of the fee depends on the type of installation and the associated inspection costs. The fee ranges from € 60 to € 2,500.
What deadlines do I have to pay attention to?
The developer must give at least six weeks' notice of the construction or significant change.
Processing duration
- It takes an average of one month to process a complaint.
- If the documents are complete,
- this does not result in any other procedure such as an exemption in the water protection or flood area, and
- no conditions are imposed by the water authority in the form of a decision,
- the project can be carried out after the six-week period has expired (fictitious approval).
- If the project is the subject of another procedure, e.g. under the Federal Immission Control Act, notification in accordance with Annex 7 No. 6.1 AwSV is not required if the project is examined as part of the other procedure. In this case, the six-week deadline does not apply.
Legal basis
Applications / forms
Contradiction
Appeal
Forms/online services available: Yes
Written form required: No
Informal application possible: Yes
Personal appearance necessary: No
What else should I know?
Comments
- If the project is the subject of another procedure, for example under the Federal Immission Control Act, notification in accordance with Annex 7 No. 6.1 AwSV is not required if the project is examined as part of the other procedure.
Author
The text was automatically translated based on the German content.
Technically approved by
Thuringian Ministry for the Environment, Energy and Nature Conservation
Professionally released on
30.12.2022
Source: Zuständigkeitsfinder Thüringen (Linie6Plus)