Applying for a permit under hazardous incident law for the construction and operation or modification of an installation that does not require a permit
Service Description
Do you want to construct, operate or modify an installation that does not require a permit and is part of the operating area or is part of an operating area?
Then you need a permit if the effects are relevant to an incident.
Does the competent authority determine that your project has an impact relevant to major accidents when examining your previous notification of an accident-relevant construction or modification?
Then you also need a permit.
These projects can lead to a significant increase in risk from the installation as a result of the construction or modification or other immission law requirements can no longer be guaranteed.
Who should I contact?
Please contact the immission control licensing authorities in Thuringia: Thuringian State Office for the Environment, Mining and Nature Conservation (TLUBN) or the districts and independent cities.
Competent authority
The responsible authorities are the immission control licensing authorities of the state of Thuringia in the form of the Thuringian State Office for the Environment, Mining and Nature Conservation (TLUBN) and the lower immission control authorities of the districts and independent cities.
Requirements
- The installation must not have any harmful effects on the environment that are technically avoidable.
- Unavoidable harmful environmental impacts of the installation must be kept to a minimum in accordance with the state of the art.
- The waste generated during operation of the plant must be disposed of properly.
- Other regulations under public law and occupational health and safety concerns must not conflict with the project.
Which documents are required?
- Application for accident-relevant construction and operation or accident-relevant
- Modification of an installation not requiring a permit
- Required drawings, plans, expert opinions
- Explanations of the installation
- Other documents (if necessary, ask the competent authority)
What deadlines do I have to pay attention to?
The application must be submitted before the system is installed, operated or modified.
Processing duration
Processing Time: 6 MonthsIn case of change
Processing Time: 7 MonthsDuring construction and operation
Applications / forms
- Objection
- Further information on how to lodge an appeal can be found in the notification.
- Complaint
What else should I know?
Approval is not required if you have already ensured the appropriate safety distance in the spatially significant planning or measure by means of binding specifications.
Author
The text was automatically translated based on the German content.
Technically approved by
Thuringian State Office for the Environment, Mining and Nature Conservation
Professionally released on
19.06.2024
Source: Zuständigkeitsfinder Thüringen (Linie6Plus)
Competent Authority
Landeshauptstadt Erfurt, Stadtverwaltung - Immissionsschutz/Chemikalienrecht
Address
99085 Erfurt
Address
Opening times
Tuesday 09:00 - 12:00 and 13:00 - 18:00
Friday 09:00 - 12:00
Transport connection
Further Authorities
Address
99423 Weimar