Building - notification of a temporary building and application for a building permit

Service Description

Temporary structures can be amusement rides, tents, stands, stages and similar structures.

These require a building permit before they are erected and put into use for the first time.

The construction permit is issued for a limited period and can be extended upon application.

The construction permit and its extension are issued by the supreme building supervisory authority or other authorities commissioned by it, for example TÜV, state inspection authorities and so on.

A technical on-site inspection precedes the granting of the building permit and its extension.

The periods until the necessary extension vary according to the potential risk and are between one and five years.

When the building permit is granted, the issuing authority prepares an inspection log for the temporary structure. In addition to technical documents, it contains the construction permit, its extensions and, if necessary, the required conditions.

The erection of the temporary structure must be reported to the responsible lower building supervisory authority and the inspection logbook must be submitted.

This authority decides on a prior acceptance of use.

Source: Zuständigkeitsfinder Thüringen (Linie6Plus)