Applying for approval for accident-relevant changes to an installation requiring approval

Service Description

Do you operate an installation that is subject to immission control licensing and constitutes an operating area or is part of an operating area, and are you planning to make changes to the installation that are relevant to incidents?

These projects can lead to a significant increase in risk being triggered by the plant as a result of the change or other requirements under immission control law can no longer be guaranteed.

Against this background, the immission control authority must review these changes.

To do this, you must submit an application for a modification permit and submit all the documents required for the assessment. The application can be made in writing or electronically.

However, approval is not required if and insofar as the obligation to maintain the appropriate safety distance is already guaranteed at the level of a spatially significant plan or measure by binding specifications.

Source: Zuständigkeitsfinder Thüringen (Linie6PLus)

No competent authority found

Please enter your location.