Special use of roads - applying for permission outside the village
Service Description
Anyone can use public federal and state roads for traffic. If you want to use these beyond this, i.e. for something other than intended, you generally need a special use permit.
Examples of when a special use permit may be required include Depositing of building materials or timber, construction or modification of a permanent or temporary access road or access route.
Process flow
If you wish to apply for a special use permit, you can submit the application informally to the responsible authority.
There is also the option of using an online service.
The procedure does not change in this case:
You submit an application informally or use the online service at the competent authority.
Describe as precisely as possible the type, the location on the federal or state road in question, the extent and the duration of the planned special use.
You should also state the impact on the affected area.
The competent authority will check the impact of the special use on the otherwise normal use and the requirements for granting the permit.
After the examination, you will receive a notice of approval or rejection.
The competent authority will limit the permit in time and/or issue it revocably.
The competent authority can attach conditions and requirements to the permit, compliance with which can be monitored and violations can be punished.
Who should I contact?
Thuringian State Office for Building and Transport
Regional departments 42 - 45
Hallesche Straße 15/ 16
99085 Erfurt
Postal address:
P.O. Box 80 03 53
99029 Erfurt
Telephone: +49 361 57413-5309
Fax: +49 361 57413-5499
E-mail: poststelle@tlbv.thüringen.de
Requirements
none
Which documents are required?
Main application informal
Evidence (optional, depending on the type of special use):
Scaled site plan
Photos or drawings of the location
For access roads and access routes:
Designation of the specific parcel of land to be developed
For access roads and access routes:
Proof of entitlement to use the property to be developed as owner or holder
What are the fees?
The costs vary depending on the type, period and area of the special use.
The cost amount depends on the respective fee schedule.
Once the special use permit has been issued, the applicant is obliged to pay a special use fee to the Thuringian State Office for Construction and Traffic.
What deadlines do I have to pay attention to?
Time limit or revocation.
Objection period
Processing duration
The processing time varies depending on the type of special use.
Legal basis
Applications / forms
Appeal
Further information on how to lodge an appeal can be found in the notification of your application
Appeal to the administrative court
Appeal
The application can be submitted in written form by post or electronically by e-mail.
For federal and state roads outside built-up areas that are the responsibility of the Thuringian State Office for Construction and Transport, you can apply online for the special use of roads.
What else should I know?
Depending on the type and scope of the special use, you should submit the application in good time in advance so that sufficient time can be allowed for the relevant inspection procedures.
Depending on the type of special use, further evidence and documents/ or plans may be required due to the respective inspection procedures; a corresponding lead time must be planned.
Under certain circumstances, it may be necessary to arrange an on-site meeting before the special use permit is issued.
For work on the road that leads to traffic space restrictions, a traffic order is also required. These are issued by the road traffic authorities of the districts.
Author
The text was automatically translated based on the German content.
Technically approved by
Thuringian State Office for Building and Transport
Professionally released on
28.10.2022
Source: Zuständigkeitsfinder Thüringen (Linie6Plus)
No competent authority found
Please enter your location.