Construction - notification of exemption from approval of a construction project

Service Description

You do not need a building permit for certain construction projects.

Instead of a building permit, only a notification is required.

For this, you need a permit exemption.

For example, a single-family house is exempt from approval if it is to be built in an area with a development plan.

If you want to deviate from the development plan, you must apply to the responsible building supervisory authority before the permit exemption.

Construction can begin after one month if the local building authority does not require a simplified building permit procedure to be carried out beforehand.

Since no building permit is issued, the builder bears sole responsibility for complying with all the requirements that his building project must meet.

Tip: Obtaining the neighbors' consent to the building project can speed up the procedure if neighborly concerns may be affected.

In Thuringia, the following applies to projects for which no building permit is likely to be required, but which must be notified:

The construction of selected smaller projects within the scope of a development plan does not require a building permit if the stipulations of the development plan are complied with and the development is secured.

Projects of this type must be submitted to the municipality for review.

The examination is carried out in a permit exemption procedure.

Source: Zuständigkeitsfinder Thüringen (Linie6PLus)

Competent Authority

No direct responsibility has yet been determined for the service you requested. Information about the responsible authority can be obtained from the address displayed.

Stadtverwaltung Bürgel

Address
Am Markt 1
07616 Bürgel
Telephone
036692 491-0
Fax
036692 22253

Further Authorities

Landratsamt Saale-Holzland-Kreis - Untere Bauaufsichtsbehörde
Address
Schloßgasse 17
07607 Eisenberg
Telephone
036691 115
Fax
036691 70-748